제조현재 사용 중인 언어로는 이 페이지를 사용할 수 없습니다. Google Translate을 사용하여
자동 번역된 페이지
를 볼 수 있습니다. Renishaw에게는 이 서비스를 제공할 책임이 없으며 번역 결과를 저희가 확인하지도 않았습니다.
Stonehouse manufacturing facility
In addition, there have been some significant capital commitments to coincide with the relocation such as additional Mazak FJV machines, a new anodising plant, new auto-deburring and raw material processing equipment, and future plans for improvements to cleaning technologies used throughout the various stages of piece part production. We now have some 150 employees at Stonehouse, with 70 machine tools producing around 300,000 parts each month.
The former Machine Hall at New Mills has been transformed into a pre-production factory housing a model-shop and pre-production machine shop, as well as a pre-production electronics facility and nursery assembly cells. At Woodchester, the next phase of refurbishment includes a building formerly occupied by a tenant to create additional space for assembly and despatch. In India, the new building located in Pune will enable the Group to manufacture components which it currently buys in, together with potential metrology products which had not been previously considered due to the cost of manufacture. Further application software will also be developed for the Group's existing and new products. Reports
다음 단계자세한 정보 또는 가격 관련 문의 에 대해 온라인 상담을 요청할 수도 있고, 현지 Renishaw 사무소 로 직접 문의할 수도 있습니다. |